Book A Free Zoom Call

MEP permit drawings in San Francisco, CA.

Permit-ready electrical, plumbing, HVAC and fire-protection drawings and MEP documentation for San Francisco homes, remodels and commercial projects, drawn to the 2025 California codes and Title 24. 100% remote: plans by upload, questions by Zoom or WhatsApp.

Drawing Title

Cover Sheet

Project
MEP Permit Drawing Services
Project Address
San Francisco, California
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
SFO-000
Sheet
01 of 10
Home/California/San Francisco/Codes in Force

Which codes apply to MEP drawings in San Francisco?

San Francisco enforces the 2025 California Building Standards Code (Title 24) with local amendments.

The 2025 California codes took effect statewide on January 1, 2026, and San Francisco adopts them with local amendments. The Department of Building Inspection (DBI) reviews permit drawings, and the Fire Department reviews sprinkler and fire alarm work.

  • Building & residential — 2025 California Building and Residential Codes with San Francisco amendments
  • Electrical — 2025 California Electrical Code (based on the 2023 NEC)
  • Plumbing & mechanical — 2025 California Plumbing and Mechanical Codes
  • Energy — 2025 California Energy Code (Title 24, Part 6)
Drawing Title

Codes in Force

Adoption
2025 California codes + SF amendments
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
SFO-001
Sheet
02 of 10
Home/California/San Francisco/Permit Office

Permit offices in and around San Francisco

Each Bay Area city runs its own plan review.

  • San Francisco — Department of Building Inspection (DBI)
  • San Francisco Fire Department — sprinkler, fire alarm and life-safety plan review
  • Oakland, Berkeley & the East Bay — each city's building department
  • Daly City, South San Francisco & San Mateo County — each city's permit office
  • San Jose & the South Bay — each city's building division
Drawing Title

Permit Office

Coverage
San Francisco Bay Area
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
SFO-002
Sheet
03 of 10
Home/California/San Francisco/Local Requirements

What San Francisco plan reviewers look for

Common San Francisco plan-review comments.

  • Title 24 energy compliance — complete energy documentation and compliance forms with the plans.
  • All-electric new construction — San Francisco requires new buildings to be all-electric, so heat-pump HVAC and water heating must be sized and shown.
  • Seismic — anchorage and bracing of mechanical, plumbing and electrical equipment.
  • Older buildings — existing conditions, service upgrades and panel capacity for remodels.
  • Commercial tenant improvements — coordinated MEP sheets and ventilation per the California Mechanical Code.
Drawing Title

Local Requirements

Focus
Title 24, all-electric, seismic
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
SFO-003
Sheet
04 of 10
Home/California/San Francisco/What's Included

What's in a San Francisco, CA MEP permit set

Every discipline your permit needs, drawn to the code your AHJ enforces.

  • Electrical — power and lighting plans, panel schedules, load calculations and single-line/riser diagrams (NEC as adopted by San Francisco)
  • Plumbing — fixture layouts, water supply sizing, DWV isometrics and gas piping (IPC as adopted)
  • HVAC / mechanical — duct layouts, equipment schedules, ventilation and Manual J/S/D load calculations (IMC as adopted)
  • Energy compliance — IECC compliance and Manual J/S/D calculations
  • Fire protection — sprinkler layouts, hydraulic calculations and fire alarm plans (NFPA 13/13R/13D, NFPA 72) where your project needs them

Trade-specific details: electrical, plumbing, HVAC and fire protection permit drawings.

Drawing Title

What's Included

Disciplines
Electrical, Plumbing, HVAC, Energy, Fire Protection
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
SFO-004
Sheet
05 of 10
Home/California/San Francisco/PE Stamping

Do San Francisco, CA MEP drawings need a PE stamp?

It depends on your project and your AHJ — we check before you pay.

Commercial MEP drawings in San Francisco generally need a California-licensed engineer's seal. Many single-family projects don't. Engineers who seal drawings in California are licensed by the California Board for Professional Engineers, Land Surveyors, and Geologists.

If your project needs sealed MEP drawings, we confirm during scoping whether a California-licensed engineer can seal your discipline and scope, and we put that in writing in your quote. If we can't arrange the seal for your project, we tell you up front, so you can have your own engineer of record review and seal the set. You never pay for drawings you can't submit.

Drawing Title

PE Stamping

Licensing Board
California BPELSG
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
SFO-005
Sheet
06 of 10
Home/California/San Francisco/Process & Turnaround

How the San Francisco, CA permit drawing process works

100% remote. Fixed price and delivery date, confirmed in writing before we start.

  1. Send your plans — upload architectural floor plans (PDF or DWG) on our quote page, by WhatsApp or by email.
  2. Quick Zoom call (optional) — we confirm scope and the San Francisco submittal checklist.
  3. Fixed quote — price and delivery date in writing within one business day.
  4. Drafting with updates — residential sets usually take 5–7 business days, light commercial 7–14, with progress updates on WhatsApp or email.
  5. Submittal & plan-review comments — PDF and DWG files ready to upload; we revise for city comments at no extra charge until approval.
Drawing Title

Process & Turnaround

Standard
5–14 business days by scope
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
SFO-006
Sheet
07 of 10
Home/California/San Francisco/FAQ

San Francisco, CA MEP permit drawing FAQ

Which code edition does San Francisco use?
The 2025 California Building Standards Code (Title 24), in effect since January 1, 2026, with San Francisco amendments.
What MEP documentation does San Francisco need for a permit?
Usually MEP floor plans, electrical panel schedules and load calculations, plumbing riser diagrams, mechanical equipment schedules with Manual J/S/D calculations, and energy-code compliance documentation, plus Title 24 energy compliance forms. We confirm the exact submittal checklist for your project during scoping.
Do you serve Oakland and the rest of the Bay Area?
Yes, every Bay Area city, each drawn to its own adopted codes and local amendments.
How fast can I get San Francisco MEP drawings?
Usually 5–7 business days for residential and 7–14 for light commercial.
Drawing Title

FAQ

Questions
3
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
SFO-007
Sheet
08 of 10
Drawing Title

Contact

Status
Issued For Construction
Note
Mark void all quotes not confirmed in writing.
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
SFO-009
Sheet
10 of 10