Book A Free Zoom Call

MEP permit drawings for building permit approval.

Permit-ready mechanical, electrical, plumbing, and fire-protection drawing sets — formatted to your local authority having jurisdiction and coordinated with a licensed Professional Engineer where your jurisdiction requires a stamp.

State guides: Texas · California · Florida · New York · Arizona · Georgia · North Carolina · Washington · Colorado · Illinois · New Jersey · Pennsylvania · Ohio · Virginia · Nevada

City guides: Houston · Dallas · Austin · Los Angeles · San Diego · San Francisco · Miami · Phoenix · Scottsdale · Denver · Las Vegas · Atlanta · Chicago · New York City

Drawing Title

Cover Sheet

Project
MEP Permit Drawing Services
Project Address
Nationwide, United States
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
PD-000
Sheet
01 of 11
Home/MEP Permit Drawings/What's Included

What’s included in our MEP permit drawing packages

Every package is built to the code edition your jurisdiction enforces and formatted the way your plan reviewer expects to see it.

Electrical (NEC)

  • Power and lighting floor plans with circuiting
  • Panel schedules and load calculations per NEC Article 220
  • Riser / single-line diagrams
  • Site electrical plan
  • Energy-code compliance documentation per state and local amendments

Plumbing (IPC / UPC)

  • Plumbing fixture plans and water-supply routing and sizing
  • DWV (drain-waste-vent) riser diagrams
  • Gas piping plans
  • Equipment and fixture schedules
  • Designed to the International Plumbing Code or Uniform Plumbing Code, per your jurisdiction

HVAC / Mechanical (IMC)

  • Duct layouts and equipment schedules
  • Heating / cooling load calculations (Manual J), equipment selection (Manual S), duct sizing (Manual D)
  • Ventilation and exhaust plans
  • Refrigerant piping and mini-split layouts
  • Designed to the International Mechanical Code

Fire Protection (NFPA 13 / NFPA 72)

  • Automatic sprinkler layouts per NFPA 13
  • Fire alarm device plans per NFPA 72
  • Hydraulic calculations for sprinkler systems
  • Standpipe and fire-pump details
  • Life-safety and egress plans

Radiant / Underfloor Heating

  • Zoning layouts and manifold schematics
  • Tubing layouts coordinated with the mechanical design

Deliverables: permit-ready PDF + editable DWG, formatted to your AHJ’s submission requirements. Need shop drawings or a PDF-to-DWG conversion of an existing set? We handle those too.

Drawing Title

What's Included

Disciplines
Electrical, Plumbing, HVAC, Fire Protection, Radiant
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
PD-001
Sheet
02 of 11
Home/MEP Permit Drawings/Process

Our 5-step process

From first call to approved permit — a fixed, transparent workflow.

  1. Book a free consultation. A short scoping call — project type, square footage, jurisdiction, timeline.
  2. Share your plans. Architectural drawings in PDF or DWG (even hand sketches to start), plus the project address so we can research your AHJ’s requirements.
  3. Get a fixed quote. Firm pricing and a delivery timeline before any work begins — no hourly meters running.
  4. We draft, you review. Markup rounds until the set is right.
  5. Submit with confidence. Receive your permit-ready package, and we provide free revisions through the city’s review cycle until your permit is approved.
Drawing Title

Process

Steps
Consult → Plans → Quote → Draft → Submit
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
PD-002
Sheet
03 of 11
Home/MEP Permit Drawings/Turnaround

Turnaround times

Confirmed in writing with your fixed quote.

  • Typical residential package: 5–7 business days from complete architectural plans
  • Light-commercial package: 7–14 business days depending on scope and discipline count
  • Rush service: available on request for tight permit deadlines — ask during your free consultation

Timelines are confirmed in writing with your fixed quote.

Drawing Title

Turnaround

Standard
5–14 business days by scope
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
PD-003
Sheet
04 of 11
Home/MEP Permit Drawings/PE Stamping

PE stamping, coordinated state by state

We confirm the appropriate licensed engineer — discipline, state, and scope — before accepting each project that requires a stamp.

Many US jurisdictions require MEP drawings to bear the seal of a Professional Engineer licensed in that state. We maintain a network of licensed PEs across the United States, and we confirm the appropriate licensed engineer — discipline, state, and scope — before accepting each project that requires a stamp.

What that means in practice:

  • Your project is matched to a PE licensed in the project jurisdiction.
  • The engineer reviews the drawings and takes professional responsibility for the sealed work, as state law requires.
  • Stamping is coordinated as part of your package — one point of contact, no chasing engineers yourself.

We do not promise a stamp for every project in every jurisdiction — no honest firm can, because each AHJ sets its own rules. What we do promise is to verify stampability up front, before you spend a dollar.

Drawing Title

PE Stamping

Coverage
Nationwide, verified per project
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
PD-004
Sheet
05 of 11
Home/MEP Permit Drawings/Who We Work With

Who we work with

From solo architects to busy GCs — if you pull permits, we fit your workflow.

  • Architecture firms that need MEP capacity without hiring in-house
  • General contractors and design-build firms
  • Residential and light-commercial builders
  • Electricians, plumbers, and mechanical installers pulling their own permits
  • Property owners and developers managing renovations
Drawing Title

Clients

Serving
Architects, builders, contractors, owners
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
PD-005
Sheet
06 of 11
Home/MEP Permit Drawings/Why Plans Get Rejected

Why MEP permit drawings get rejected, and how we prevent it

Six plan-review problems we check for on every set before it reaches your city.

Most permit delays on MEP sheets come from a short list of avoidable problems. We check every set against this list before it goes to your plan reviewer.

1. Missing or wrong load calculations

Electrical service sizing without an NEC Article 220 calculation, or HVAC equipment chosen without a Manual J / heat-load calculation, is one of the most common reasons for a correction letter. Every package we draw includes the calculation the reviewer will ask for.

2. Wrong code edition or missing local amendments

Cities adopt the NEC, IPC/UPC and IMC on their own schedules and add local amendments. Drawing to the wrong edition gets a set sent back. We confirm the adopted codes for your exact jurisdiction before we draw.

3. Incomplete panel schedules and riser diagrams

Reviewers expect circuit numbers, breaker sizes, wire sizes and connected loads that tie back to the floor plans. Our panel schedules and single-line diagrams are coordinated with the plans sheet by sheet.

4. Plumbing fixture units and pipe sizing not shown

Water supply and DWV sizing must be backed by fixture-unit counts. We show fixture-unit tables, pipe sizes and riser diagrams so the reviewer can verify compliance quickly.

5. Energy-code and ventilation documentation left out

Many states require energy-code forms (for example Title 24 in California) and ventilation or exhaust calculations. We include the forms and notes your state requires.

6. Sheets that don't match the architectural plans

Fixtures, equipment and rooms that move between the architectural and MEP sheets trigger comments. We draw on your current architectural set and re-check it before submission. If comments still come back, we revise free until your permit is approved.

Drawing Title

Plan Review Checklist

Purpose
Fewer correction letters
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
PD-006
Sheet
07 of 11
Home/MEP Permit Drawings/States & Cities

MEP permit drawings by state and city

Remote service for every US jurisdiction, with local guides for the busiest permit markets.

Drawing Title

Coverage Map

Coverage
All 50 states, remote
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
PD-007
Sheet
08 of 11
Home/MEP Permit Drawings/FAQ

Frequently asked questions

What are MEP permit drawings?
MEP permit drawings are the mechanical, electrical, plumbing, and fire-protection construction documents a city or county building department requires before issuing a building permit. They show how a building’s hidden systems — power, lighting, water, drainage, heating, cooling, and fire suppression — are designed, sized, and routed, so the plan reviewer can verify code compliance before construction begins.
Which codes do your drawings follow?
We design to the code edition your jurisdiction enforces: the National Electrical Code (NEC) for electrical, the International Plumbing Code (IPC) or Uniform Plumbing Code (UPC) for plumbing, the International Mechanical Code (IMC) for HVAC, and NFPA 13 / NFPA 72 for fire protection — plus your state and local amendments. We research each AHJ’s adopted codes during scoping.
Do I need a PE stamp on my MEP drawings?
It depends on your jurisdiction and project scope. Most US cities and counties require a Professional Engineer’s seal on commercial MEP drawings, and many require it on residential work above certain thresholds. We confirm your AHJ’s stamping requirements during the free consultation and match stamped projects to a PE licensed in that state.
How much do MEP permit drawings cost?
Pricing is quoted per project based on building type, square footage, number of disciplines, and scope — commercial work costs more than residential. We give you a fixed quote with a delivery timeline before any work starts, so there are no surprises. The initial consultation is free.
How long does it take to get MEP drawings done?
A typical residential package takes 5–7 business days from receipt of complete architectural plans; light-commercial packages take 7–14 business days depending on scope. Rush service is available for tight permit deadlines. Your exact timeline is confirmed in writing with your quote.
What do you need from me to start?
Your architectural floor plans (PDF or DWG — even clear hand sketches work to begin), the project address, and the jurisdiction you’re permitting in. From that we research your AHJ’s submittal requirements, code editions, and stamping rules, then send your fixed quote.
What if the city reviewer asks for corrections?
That’s normal — most jurisdictions issue at least one round of plan-review comments. We revise your drawings to address the reviewer’s MEP comments at no additional charge, and keep revising through the review cycle until your permit is approved.
Do you work in my state?
We prepare MEP permit drawings for all 50 states. Because every city and county has its own submittal format, code edition, and stamping rules, we research your specific AHJ before drafting — so the set arrives formatted the way your reviewer expects.
What’s the difference between permit drawings and shop drawings?
Permit drawings prove code compliance to the AHJ and get your permit issued; they’re diagrammatic and performance-based. Shop drawings are the fabricator/installer-level detail produced later for actual construction. We produce both — most clients start with the permit set.
Can you convert my existing PDF or scanned drawings to DWG?
Yes. We convert PDFs, scans, and even hand sketches into editable DWG files, which can then serve as the base for a full MEP permit package or be used on their own.
Can you prepare MEP permit drawings if I'm in a different state?
Yes. We are a 100% remote team and work on projects in all 50 states. You upload your plans, we confirm your city's adopted codes and submittal rules, and we deliver a permit-ready PDF and DWG set. Questions are handled by Zoom or WhatsApp, usually the same day.
Do you know my city's permit requirements?
We research your exact jurisdiction during scoping: adopted code editions, local amendments, energy-code forms and how the building department wants sheets formatted. We publish guides for busy markets such as Houston, Dallas, Austin, Los Angeles, San Diego, Miami, Phoenix, Atlanta, Chicago and New York City, and we cover every other US city too.
Why do MEP drawings get rejected in plan review?
The most common reasons are missing load calculations, the wrong code edition, incomplete panel schedules, plumbing sizing without fixture-unit counts, missing energy-code documentation, and MEP sheets that don't match the architectural plans. We check every set against these before submission and revise free until approval.
Drawing Title

FAQ

Questions
10
Topics
Codes, cost, timeline, stamping
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
PD-008
Sheet
09 of 11
Drawing Title

Contact

Status
Issued For Construction
Note
Mark void all quotes not confirmed in writing.
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
PD-010
Sheet
11 of 11