Book A Free Zoom Call

MEP permit drawings in Atlanta, GA.

Permit-ready electrical, plumbing, HVAC and fire-protection drawings for Atlanta homes, restaurants and tenant build-outs, drawn to Georgia's current state minimum codes. 100% remote: plans by upload, questions by Zoom or WhatsApp.

Drawing Title

Cover Sheet

Project
MEP Permit Drawing Services
Project Address
Atlanta, Georgia
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
ATL-000
Sheet
01 of 10
Home/Georgia/Atlanta/Codes in Force

Which codes apply to MEP drawings in Atlanta?

Atlanta enforces Georgia's statewide minimum codes, updated on January 1, 2026.

Georgia's State Minimum Standard Codes, adopted by the Department of Community Affairs, apply in Atlanta, and an updated set took effect on January 1, 2026. The City of Atlanta Office of Buildings reviews MEP drawings inside city limits. Surrounding cities and counties review their own permits.

  • Building & residential — IBC and IRC with Georgia amendments
  • Electrical — NEC with Georgia amendments
  • Plumbing, mechanical & gas — IPC, IMC and IFGC with Georgia amendments
  • Energy — Georgia State Minimum Standard Energy Code
Drawing Title

Codes in Force

Adoption
Georgia State Minimum Codes (2026)
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
ATL-001
Sheet
02 of 10
Home/Georgia/Atlanta/Permit Office

Permit offices in and around Atlanta

  • City of Atlanta — Office of Buildings, Department of City Planning
  • Fulton County & DeKalb County — county permitting for unincorporated areas
  • Sandy Springs, Alpharetta & Roswell — each city's own plan review
  • Marietta & Cobb County — city and county permit offices
  • Gwinnett County cities — plus every metro Atlanta jurisdiction
Drawing Title

Permit Office

Coverage
Atlanta & surrounding area
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
ATL-002
Sheet
03 of 10
Home/Georgia/Atlanta/Local Requirements

What Atlanta plan reviewers look for

What Atlanta-area reviewers commonly ask for.

  • Georgia energy code — documentation to Georgia's version of the IECC, with its state supplements.
  • Restaurant and retail build-outs — coordinated kitchen exhaust, grease interceptor and electrical sheets.
  • Ventilation and humidity — mechanical ventilation for Atlanta's humid climate.
  • Electrical loads — panel schedules with EV and heat-pump loads.
  • Manual J/S/D — for climate zone 3A.
Drawing Title

Local Requirements

Focus
Energy, build-outs, ventilation
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
ATL-003
Sheet
04 of 10
Home/Georgia/Atlanta/What's Included

What's in a Atlanta, GA MEP permit set

Every discipline your permit needs, drawn to the code your AHJ enforces.

  • Electrical — power and lighting plans, panel schedules, load calculations and single-line/riser diagrams (NEC with Georgia amendments)
  • Plumbing — fixture layouts, water supply sizing, DWV isometrics and gas piping (IPC with Georgia amendments)
  • HVAC / mechanical — duct layouts, equipment schedules, ventilation and Manual J/S/D load calculations (IMC with Georgia amendments)
  • Energy compliance — Georgia energy code documentation and Manual J/S/D
  • Fire protection — sprinkler layouts, hydraulic calculations and fire alarm plans (NFPA 13/13R/13D, NFPA 72) where your project needs them

Trade-specific details: electrical, plumbing, HVAC and fire protection permit drawings.

Drawing Title

What's Included

Disciplines
Electrical, Plumbing, HVAC, Energy, Fire Protection
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
ATL-004
Sheet
05 of 10
Home/Georgia/Atlanta/PE Stamping

Do Atlanta, GA MEP drawings need a PE stamp?

It depends on your project and your AHJ — we check before you pay.

Commercial MEP drawings in Atlanta generally need a Georgia-registered professional's seal. Many single-family projects don't.

Engineers who seal drawings in Georgia are licensed by the Georgia State Board of Registration for Professional Engineers and Land Surveyors. If your project needs sealed MEP drawings, we confirm during scoping whether a Georgia-licensed engineer can seal your discipline and scope, and we put that in writing in your quote. If we can't arrange the seal for your project, we tell you up front, so you can have your own engineer of record review and seal the set. You never pay for drawings you can't submit.

Drawing Title

PE Stamping

Licensing Board
GA PE Board
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
ATL-005
Sheet
06 of 10
Home/Georgia/Atlanta/Process & Turnaround

How the Atlanta, GA permit drawing process works

100% remote. Fixed price and delivery date, confirmed in writing before we start.

  1. Send your plans — upload architectural floor plans (PDF or DWG) on our quote page, by WhatsApp or by email.
  2. Quick Zoom call (optional) — we confirm scope and the Atlanta submittal checklist.
  3. Fixed quote — price and delivery date in writing within one business day.
  4. Drafting with updates — residential sets usually take 5–7 business days, light commercial 7–14, with progress updates on WhatsApp or email.
  5. Submittal & plan-review comments — PDF and DWG files ready to upload; we revise for city comments at no extra charge until approval.
Drawing Title

Process & Turnaround

Standard
5–14 business days by scope
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
ATL-006
Sheet
07 of 10
Home/Georgia/Atlanta/FAQ

Atlanta, GA MEP permit drawing FAQ

Which codes apply in Atlanta?
Georgia's statewide minimum codes, updated January 1, 2026, enforced by the Atlanta Office of Buildings inside city limits.
Do you serve Sandy Springs, Alpharetta and Marietta?
Yes, and every metro Atlanta city and county.
How fast can I get Atlanta MEP drawings?
Usually 5–7 business days for residential and 7–14 for light commercial.
Drawing Title

FAQ

Questions
3
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
ATL-007
Sheet
08 of 10
Drawing Title

Contact

Status
Issued For Construction
Note
Mark void all quotes not confirmed in writing.
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
ATL-009
Sheet
10 of 10