MEP permit drawings in New York.

Permit-ready electrical, plumbing, HVAC and fire-protection drawings for New York City, Long Island, Westchester, Buffalo, Rochester, Albany and every New York jurisdiction. 100% remote: plans by upload, questions by Zoom or WhatsApp.

Drawing Title

Cover Sheet

Project
MEP Permit Drawing Services
Project Address
Statewide, New York
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
NY-000
Sheet
01 of 10
Home/New York/Codes in Force

Which codes apply to MEP drawings in New York?

New York has two systems: the NYS Uniform Code statewide, and the NYC Construction Codes inside the five boroughs.

Outside New York City, every municipality enforces the New York State Uniform Fire Prevention and Building Code and the State Energy Conservation Construction Code. Updated 2025 editions took effect on December 31, 2025. New York City writes and enforces its own NYC Construction Codes, Electrical Code and Energy Conservation Code through the Department of Buildings (DOB).

  • NYS Uniform Code — Building, Residential, Mechanical, Plumbing, Fuel Gas and Fire codes based on the International Codes with New York amendments
  • NYS Energy Code — the State Energy Conservation Construction Code; some municipalities have also adopted the stricter NYStretch code
  • Electrical — the NEC as referenced by the Uniform Code outside NYC
  • NYC Construction Codes — NYC Building, Mechanical, Plumbing and Fuel Gas codes
  • NYC Electrical Code and NYC Energy Conservation Code (NYCECC)

Drawings prepared for Westchester or Long Island won't automatically satisfy a DOB examiner in Manhattan or Brooklyn. We set up your sheets, notes and code references for the system your project falls under.

Drawing Title

Codes in Force

Adoption
NYS Uniform Code; NYC has its own codes
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
NY-001
Sheet
02 of 10
Home/New York/Jurisdictions

New York cities and counties we prepare drawings for

Different permit offices, different filing rules. We format your set to match.

  • New York City (all five boroughs) — NYC Department of Buildings, filed through DOB NOW, with plumbing, mechanical, sprinkler and electrical filings
  • Long Island — Nassau and Suffolk County towns and villages (Hempstead, Oyster Bay, Huntington, Brookhaven and others)
  • Westchester County — Yonkers, New Rochelle, White Plains and village building departments
  • Buffalo — City of Buffalo Department of Permit & Inspection Services
  • Rochester — City of Rochester Bureau of Buildings & Zoning
  • Albany, Syracuse, Yonkers & the Hudson Valley — plus every other New York city, town and village

In New York, towns and villages often run their own building departments. Two addresses a mile apart can have different submittal checklists, so we confirm your exact AHJ first.

Drawing Title

Jurisdictions

Coverage
All New York cities & counties
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
NY-002
Sheet
03 of 10
Home/New York/State Requirements

What New York plan reviewers look for

What New York examiners commonly flag on MEP sets.

  • Energy code compliance — envelope, HVAC and lighting compliance documentation (COMcheck/REScheck or the energy analysis your AHJ requires), matched to the NYS Energy Code or NYCECC.
  • NYC filing structure — separate work types and drawings for plumbing, mechanical, sprinkler and electrical, set up the way DOB NOW expects.
  • Local Law 97 awareness — larger NYC buildings face carbon-emissions limits, so equipment selections and electrification choices matter.
  • Cold-climate heat pumps — sizing and backup heat strategy for New York's climate zones 4–6, with Manual J/S/D for residential projects.
  • Gas piping — pipe sizing and isometrics for gas work, which gets close scrutiny in New York City.
Drawing Title

State Requirements

Focus
Energy, filings, emissions
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
NY-003
Sheet
04 of 10
Home/New York/What's Included

What's in a New York MEP permit set

Every discipline your permit needs, drawn to the code your AHJ enforces.

  • Electrical — power and lighting plans, panel schedules, load calculations and single-line/riser diagrams (NEC or NYC Electrical Code)
  • Plumbing — fixture layouts, water supply sizing, DWV isometrics and gas piping (NYS or NYC Plumbing Code)
  • HVAC / mechanical — duct layouts, equipment schedules, ventilation and Manual J/S/D load calculations (NYS or NYC Mechanical Code)
  • Energy compliance — NYS Energy Code or NYCECC compliance documentation and Manual J/S/D calculations
  • Fire protection — sprinkler layouts, hydraulic calculations and fire alarm plans (NFPA 13/13R/13D, NFPA 72) where your project needs them

Trade-specific details: electrical, plumbing, HVAC and fire protection permit drawings.

Drawing Title

What's Included

Disciplines
Electrical, Plumbing, HVAC, Energy, Fire Protection
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
NY-004
Sheet
05 of 10
Home/New York/PE Stamping

Do New York MEP drawings need a PE stamp?

It depends on your project and your AHJ — we check before you pay.

New York generally requires construction documents to be sealed by a New York-licensed PE or registered architect, with exceptions for some small residential projects. NYC DOB filings require a licensed applicant of record. In practice, most New York MEP permit sets need a New York design professional's seal.

Engineers who seal drawings in New York are licensed by the New York State Education Department, Office of the Professions (State Board for Engineering). If your project needs sealed MEP drawings, we confirm during scoping whether a New York-licensed engineer can seal your discipline and scope, and we put that in writing in your quote. If we can't arrange the seal for your project, we tell you up front, so you can have your own engineer of record review and seal the set. You never pay for drawings you can't submit.

Drawing Title

PE Stamping

Licensing Board
NYSED
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
NY-005
Sheet
06 of 10
Home/New York/Process & Turnaround

How the New York permit drawing process works

Fixed price and delivery date, confirmed in writing before we start.

  1. Free consultation — tell us about the project, the address and the permit office.
  2. Send your plans — architectural floor plans in PDF or DWG (sketches work for small residential jobs).
  3. Code check & fixed quote — we confirm the code editions and submittal checklist your New York AHJ uses, then send a fixed price and timeline.
  4. Drafting & your review — residential sets usually take 5–7 business days, light commercial 7–14. You mark up, we revise.
  5. Submittal & plan-review comments — you get PDF and DWG files ready to upload; if the reviewer issues comments, we revise the drawings at no extra charge until approval.
Drawing Title

Process & Turnaround

Standard
5–14 business days by scope
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
NY-006
Sheet
07 of 10
Home/New York/FAQ

New York MEP permit drawing FAQ

Which code applies to my New York project?
Inside the five boroughs, the NYC Construction Codes and NYC Energy Conservation Code apply, enforced by the Department of Buildings. Everywhere else in New York State, the NYS Uniform Code and State Energy Code apply, and the 2025 editions took effect on December 31, 2025.
Do New York MEP drawings need a PE stamp?
Usually yes. New York requires most construction documents to be sealed by a licensed PE or registered architect, and NYC filings need a licensed applicant of record. We confirm your project's requirement before quoting.
Can you prepare drawings for NYC DOB NOW filings?
Yes. We prepare plumbing, mechanical, sprinkler and electrical drawings formatted for DOB review. The filing itself is submitted by your licensed applicant of record.
What is NYStretch?
NYStretch is an optional, stricter energy code that some New York municipalities have adopted. If your town uses it, your HVAC, lighting and envelope design must meet the higher bar, and we check before designing.
How long do New York MEP permit drawings take?
Typically 5–7 business days for residential and 7–14 for light commercial after complete architectural plans. Larger NYC projects are scoped individually.
Do you design heat pump systems for New York homes?
Yes. We size cold-climate heat pumps with Manual J/S/D calculations and show the electrical service upgrades they often need.
Drawing Title

FAQ

Questions
6
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
NY-007
Sheet
08 of 10
Drawing Title

Contact

Status
Issued For Construction