Book A Free Zoom Call

MEP permit drawings & documentation in Jacksonville, FL.

Permit-ready electrical, plumbing, HVAC and fire-protection drawings and MEP documentation for Jacksonville tenant improvements, restaurants, retail, homes and additions, drawn to the Florida Building Code. 100% remote: plans by upload, questions by Zoom or WhatsApp.

Drawing Title

Cover Sheet

Project
MEP Permit Drawing Services
Project Address
Jacksonville, Florida
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
JAX-000
Sheet
01 of 10
Home/Florida/Jacksonville/Codes in Force

Which codes apply to MEP drawings in Jacksonville?

Jacksonville enforces the Florida Building Code, 8th Edition (2023), with the 2020 NEC.

The City of Jacksonville and Duval County are consolidated, so one Building Inspection Division reviews permit drawings for most of the county. Florida writes its own statewide code, and the 9th Edition (2026) is expected to take effect around December 31, 2026, so projects submitted after that date will need the new edition. We confirm the code basis before we draw.

  • Building & residential — Florida Building Code, 8th Edition (2023): Building, Residential and Existing Building
  • Electrical — 2020 NEC (NFPA 70)
  • Plumbing, mechanical & fuel gas — FBC Plumbing, Mechanical and Fuel Gas, 8th Edition
  • Energy — FBC Energy Conservation, 8th Edition
  • Accessibility — FBC Accessibility, for fixture counts and clearances in commercial spaces
Drawing Title

Codes in Force

Adoption
FBC 8th Edition (2023)
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
JAX-001
Sheet
02 of 10
Home/Florida/Jacksonville/Permit Office

Permit offices in and around Jacksonville

Duval County is mostly one office, but the beaches and neighbouring counties review their own plans.

  • City of Jacksonville / Duval County — Building Inspection Division, with online permit submission through JaxEPICS
  • Jacksonville Beach, Neptune Beach & Atlantic Beach — each city's building department
  • St. Johns County — county building services, including St. Augustine area projects
  • Clay County & Nassau County — county building departments, including Orange Park and Fernandina Beach area projects
Drawing Title

Permit Office

Coverage
Northeast Florida
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
JAX-002
Sheet
03 of 10
Home/Florida/Jacksonville/Local Requirements

What Jacksonville plan reviewers look for

Common plan-review comments on Northeast Florida MEP sets.

  • Wind loads — rooftop HVAC units, condensers and exhaust fans anchored for Florida Building Code wind design, with the anchorage shown on the drawings.
  • Flood zones — electrical and mechanical equipment raised above the design flood elevation near the St. Johns River and the beaches.
  • Humidity — Manual J/S/D for hot-humid climate zone 2, with ventilation and dehumidification that keep moisture under control.
  • Energy code — FBC Energy Conservation compliance forms and calculations.
  • Restaurants and retail — grease interceptor sizing, water heater and gas piping calculations, kitchen hood make-up air and panel schedules for tenant improvements.
Drawing Title

Local Requirements

Focus
Wind, flood, humidity
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
JAX-003
Sheet
04 of 10
Home/Florida/Jacksonville/What's Included

What's in a Jacksonville, FL MEP permit set

Every discipline your permit needs, drawn to the code your AHJ enforces.

  • Electrical — power and lighting plans, panel schedules, load calculations and single-line/riser diagrams (2020 NEC, as enforced in Jacksonville)
  • Plumbing — fixture layouts, water supply sizing, DWV isometrics and gas piping
  • HVAC / mechanical — duct layouts, equipment schedules, ventilation and Manual J/S/D load calculations
  • Energy compliance — energy-code compliance documentation and Manual J/S/D calculations
  • Fire protection — sprinkler layouts, hydraulic calculations and fire alarm plans (NFPA 13/13R/13D, NFPA 72) where your project needs them

Trade-specific details: electrical, plumbing, HVAC and fire protection permit drawings.

Drawing Title

What's Included

Disciplines
Electrical, Plumbing, HVAC, Energy, Fire Protection
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
JAX-004
Sheet
05 of 10
Home/Florida/Jacksonville/PE Stamping

Do Jacksonville MEP drawings need a PE stamp?

It depends on your project and your AHJ — we check before you pay.

Commercial MEP drawings in Jacksonville generally need a Florida-licensed engineer's seal. Many single-family projects don't. Engineers who seal drawings in Florida are licensed by the Florida Board of Professional Engineers.

If your project needs sealed MEP drawings, we confirm during scoping whether a Florida-licensed engineer can seal your discipline and scope, and we put that in writing in your quote. If we can't arrange the seal for your project, we tell you up front, so you can have your own engineer of record review and seal the set. You never pay for drawings you can't submit.

Drawing Title

PE Stamping

Licensing Board
Florida Board of Professional Engineers
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
JAX-005
Sheet
06 of 10
Home/Florida/Jacksonville/Process & Turnaround

How the Jacksonville permit drawing process works

100% remote. Fixed price and delivery date, confirmed in writing before we start.

  1. Send your plans — upload architectural floor plans (PDF or DWG) on our quote page, by WhatsApp or by email.
  2. Quick Zoom call (optional) — we confirm scope and the Jacksonville submittal checklist.
  3. Fixed quote — price and delivery date in writing within one business day.
  4. Drafting with updates — residential sets usually take 5–7 business days, light commercial 7–14, with progress updates on WhatsApp or email.
  5. Submittal & plan-review comments — PDF and DWG files ready to upload; we revise for city comments at no extra charge until approval.
Drawing Title

Process & Turnaround

Standard
5–14 business days by scope
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
JAX-006
Sheet
07 of 10
Home/Florida/Jacksonville/FAQ

Jacksonville, FL MEP permit drawing FAQ

Which codes does Jacksonville use for MEP drawings?
The Florida Building Code, 8th Edition (2023) for building, plumbing, mechanical, fuel gas and energy, with the 2020 NEC for electrical. The 9th Edition (2026) is expected to take effect around December 31, 2026, so we confirm the edition that applies on your submittal date.
What MEP documentation does Jacksonville need for a commercial permit?
Usually MEP floor plans, electrical panel schedules and load calculations, plumbing riser diagrams and fixture counts, mechanical equipment schedules with load calculations, rooftop equipment anchorage for wind loads and Florida energy-code compliance documentation. We confirm the exact checklist during scoping.
Do you cover Jacksonville Beach, St. Johns County and the rest of Northeast Florida?
Yes. Jacksonville Beach, Neptune Beach, Atlantic Beach, St. Johns County, Clay County and Nassau County, each drawn to the code and local amendments that office enforces.
How fast can I get Jacksonville MEP drawings?
Usually 5–7 business days for residential and 7–14 for light commercial and tenant improvements, with a fixed delivery date in your quote.
Drawing Title

FAQ

Questions
4
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
JAX-007
Sheet
08 of 10
Drawing Title

Contact

Status
Issued For Construction
Note
Mark void all quotes not confirmed in writing.
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
JAX-009
Sheet
10 of 10