Book A Free Zoom Call

MEP permit drawings & documentation in Salt Lake City, UT.

Permit-ready electrical, plumbing, HVAC and fire-protection drawings and MEP documentation for Salt Lake City homes, ADUs, additions and commercial projects, drawn to the codes adopted by the State of Utah. 100% remote: plans by upload, questions by Zoom or WhatsApp.

Drawing Title

Cover Sheet

Project
MEP Permit Drawing Services
Project Address
Salt Lake City, Utah
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
SLC-000
Sheet
01 of 10
Home/US Cities/Salt Lake City/Codes in Force

Which codes apply to MEP drawings in Salt Lake City?

Salt Lake City follows the building codes adopted and amended by the State of Utah.

Utah sets one construction code for the whole state, and Salt Lake City Building Services reviews permit drawings against it. The current editions took effect on July 1, 2026, and the city applies the codes in effect on the date your plans are accepted for review. Older projects already in review may still be on the previous editions, so we confirm the code basis before we draw.

  • Building — 2024 IBC (commercial) and 2021 IRC (one- and two-family homes), with Utah amendments
  • Electrical — 2023 NEC
  • Plumbing, mechanical & fuel gas — 2024 IPC, IMC and IFGC with Utah amendments
  • Energy — 2024 IECC as adopted by Utah
  • Existing buildings — 2024 IEBC for alterations and changes of use
Drawing Title

Codes in Force

Adoption
Utah State Construction Code
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
SLC-001
Sheet
02 of 10
Home/US Cities/Salt Lake City/Permit Office

Permit offices in and around Salt Lake City

Each city along the Wasatch Front runs its own plan review.

  • Salt Lake City — Building Services, with online permit applications through the city's Accela Citizen Access portal
  • West Valley City, West Jordan & South Jordan — each city's building division
  • Sandy, Murray, Draper & Taylorsville — each city's building department
  • Unincorporated Salt Lake County — county building services
  • Provo, Orem & Ogden — city building departments in Utah and Weber counties
Drawing Title

Permit Office

Coverage
Salt Lake County & Wasatch Front
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
SLC-002
Sheet
03 of 10
Home/US Cities/Salt Lake City/Local Requirements

What Salt Lake City plan reviewers look for

Common plan-review comments on Salt Lake City MEP sets.

  • Seismic restraint — the Wasatch Fault puts much of the valley in a high seismic design category, so equipment anchorage, duct and pipe bracing and water heater strapping need to be shown.
  • Altitude — gas appliance input and venting checked for the valley's roughly 4,300 ft elevation.
  • Heating loads — Manual J/S/D for cold climate zone 5B, including heat-pump sizing for all-electric homes.
  • Energy code — Utah's energy-code compliance path and the documentation it requires.
  • EV chargers, solar and ADUs — NEC load calculations, service sizing and panel capacity for added loads and new units.
Drawing Title

Local Requirements

Focus
Seismic, altitude, heating loads
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
SLC-003
Sheet
04 of 10
Home/US Cities/Salt Lake City/What's Included

What's in a Salt Lake City, UT MEP permit set

Every discipline your permit needs, drawn to the code your AHJ enforces.

  • Electrical — power and lighting plans, panel schedules, load calculations and single-line/riser diagrams (NEC as adopted by Utah)
  • Plumbing — fixture layouts, water supply sizing, DWV isometrics and gas piping
  • HVAC / mechanical — duct layouts, equipment schedules, ventilation and Manual J/S/D load calculations
  • Energy compliance — energy-code compliance documentation and Manual J/S/D calculations
  • Fire protection — sprinkler layouts, hydraulic calculations and fire alarm plans (NFPA 13/13R/13D, NFPA 72) where your project needs them

Trade-specific details: electrical, plumbing, HVAC and fire protection permit drawings.

Drawing Title

What's Included

Disciplines
Electrical, Plumbing, HVAC, Energy, Fire Protection
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
SLC-004
Sheet
05 of 10
Home/US Cities/Salt Lake City/PE Stamping

Do Salt Lake City MEP drawings need a PE stamp?

It depends on your project and your AHJ — we check before you pay.

Commercial MEP drawings in Salt Lake City generally need a Utah-licensed engineer's seal. Many single-family and ADU projects don't. Engineers who seal drawings in Utah are licensed by the Utah Division of Professional Licensing (DOPL).

If your project needs sealed MEP drawings, we confirm during scoping whether a Utah-licensed engineer can seal your discipline and scope, and we put that in writing in your quote. If we can't arrange the seal for your project, we tell you up front, so you can have your own engineer of record review and seal the set. You never pay for drawings you can't submit.

Drawing Title

PE Stamping

Licensing Board
Utah DOPL
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
SLC-005
Sheet
06 of 10
Home/US Cities/Salt Lake City/Process & Turnaround

How the Salt Lake City permit drawing process works

100% remote. Fixed price and delivery date, confirmed in writing before we start.

  1. Send your plans — upload architectural floor plans (PDF or DWG) on our quote page, by WhatsApp or by email.
  2. Quick Zoom call (optional) — we confirm scope and the Salt Lake City submittal checklist.
  3. Fixed quote — price and delivery date in writing within one business day.
  4. Drafting with updates — residential sets usually take 5–7 business days, light commercial 7–14, with progress updates on WhatsApp or email.
  5. Submittal & plan-review comments — PDF and DWG files ready to upload; we revise for city comments at no extra charge until approval.
Drawing Title

Process & Turnaround

Standard
5–14 business days by scope
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
SLC-006
Sheet
07 of 10
Home/US Cities/Salt Lake City/FAQ

Salt Lake City, UT MEP permit drawing FAQ

Which codes does Salt Lake City use for MEP drawings?
Salt Lake City enforces the codes adopted by the State of Utah. From July 1, 2026 that means the 2024 IBC, 2021 IRC, 2024 IPC, IMC and IFGC, the 2023 NEC and the 2024 IECC, with Utah amendments. The city applies the codes in effect on the date your plans are accepted for review.
What MEP documentation does Salt Lake City need for a permit?
Usually MEP floor plans, electrical panel schedules and load calculations, plumbing riser diagrams, mechanical equipment schedules with Manual J/S/D calculations, seismic bracing notes and energy-code compliance documentation. We confirm the exact submittal checklist for your project during scoping.
Do you serve West Valley City, Sandy and the rest of the Wasatch Front?
Yes. West Valley City, Sandy, West Jordan, South Jordan, Murray, Provo, Orem, Ogden and unincorporated Salt Lake County, each drawn to the codes and amendments that jurisdiction enforces.
How fast can I get Salt Lake City MEP drawings?
Usually 5–7 business days for residential and 7–14 for light commercial, with a fixed delivery date in your quote.
Drawing Title

FAQ

Questions
4
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
SLC-007
Sheet
08 of 10
Drawing Title

Contact

Status
Issued For Construction
Note
Mark void all quotes not confirmed in writing.
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
SLC-009
Sheet
10 of 10