Book A Free Zoom Call

MEP permit drawings in Austin, TX.

Permit-ready electrical, plumbing, HVAC and fire-protection drawings for Austin homes, ADUs, remodels and commercial projects, including Austin's local energy amendments. 100% remote: plans by upload, questions by Zoom or WhatsApp.

Drawing Title

Cover Sheet

Project
MEP Permit Drawing Services
Project Address
Austin, Texas
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
AUS-000
Sheet
01 of 10
Home/Texas/Austin/Codes in Force

Which codes apply to MEP drawings in Austin?

Austin adopts the International Codes with local amendments, including stricter energy rules.

The City of Austin adopts editions of the International Codes and the NEC with Austin amendments, and its energy amendments are stricter than most Texas cities. MEP drawings are reviewed by the Development Services Department.

  • Building & residential — IBC and IRC with Austin amendments
  • Electrical — NEC with Austin amendments
  • Plumbing & mechanical — as adopted by Austin
  • Energy — Austin's amended energy code, stricter than the state minimum
Drawing Title

Codes in Force

Adoption
Austin-adopted codes with local energy amendments
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
AUS-001
Sheet
02 of 10
Home/Texas/Austin/Permit Office

Permit offices in and around Austin

  • City of Austin — Development Services Department
  • Travis County (unincorporated) — Travis County development services
  • Round Rock, Cedar Park & Georgetown — Williamson County cities
  • Pflugerville, Leander & Kyle — each city's building office
  • San Marcos & Buda — plus every Central Texas jurisdiction
Drawing Title

Permit Office

Coverage
Austin & surrounding area
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
AUS-002
Sheet
03 of 10
Home/Texas/Austin/Local Requirements

What Austin plan reviewers look for

Common Austin plan-review comments.

  • Energy compliance — documentation to Austin's amended energy code, a frequent source of comments.
  • ADUs and additions — electrical service and HVAC sizing for second units and additions.
  • Manual J/S/D — load calculations for climate zone 2A/3A.
  • Electrical loads — EV chargers, heat pumps and solar on the panel schedule.
  • Commercial build-outs — coordinated MEP sheets for restaurants and offices.
Drawing Title

Local Requirements

Focus
Energy, ADUs, loads
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
AUS-003
Sheet
04 of 10
Home/Texas/Austin/What's Included

What's in a Austin, TX MEP permit set

Every discipline your permit needs, drawn to the code your AHJ enforces.

  • Electrical — power and lighting plans, panel schedules, load calculations and single-line/riser diagrams (NEC with Austin amendments)
  • Plumbing — fixture layouts, water supply sizing, DWV isometrics and gas piping (as adopted by Austin)
  • HVAC / mechanical — duct layouts, equipment schedules, ventilation and Manual J/S/D load calculations (as adopted by Austin)
  • Energy compliance — Austin energy-code documentation and Manual J/S/D calculations
  • Fire protection — sprinkler layouts, hydraulic calculations and fire alarm plans (NFPA 13/13R/13D, NFPA 72) where your project needs them

Trade-specific details: electrical, plumbing, HVAC and fire protection permit drawings.

Drawing Title

What's Included

Disciplines
Electrical, Plumbing, HVAC, Energy, Fire Protection
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
AUS-004
Sheet
05 of 10
Home/Texas/Austin/PE Stamping

Do Austin, TX MEP drawings need a PE stamp?

It depends on your project and your AHJ — we check before you pay.

Commercial MEP drawings in Austin generally need a Texas-licensed PE seal. Many single-family projects and ADUs can be permitted without one.

Engineers who seal drawings in Texas are licensed by the Texas Board of Professional Engineers and Land Surveyors (TBPELS). If your project needs sealed MEP drawings, we confirm during scoping whether a Texas-licensed engineer can seal your discipline and scope, and we put that in writing in your quote. If we can't arrange the seal for your project, we tell you up front, so you can have your own engineer of record review and seal the set. You never pay for drawings you can't submit.

Drawing Title

PE Stamping

Licensing Board
TBPELS
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
AUS-005
Sheet
06 of 10
Home/Texas/Austin/Process & Turnaround

How the Austin, TX permit drawing process works

100% remote. Fixed price and delivery date, confirmed in writing before we start.

  1. Send your plans — upload architectural floor plans (PDF or DWG) on our quote page, by WhatsApp or by email.
  2. Quick Zoom call (optional) — we confirm scope and the Austin submittal checklist.
  3. Fixed quote — price and delivery date in writing within one business day.
  4. Drafting with updates — residential sets usually take 5–7 business days, light commercial 7–14, with progress updates on WhatsApp or email.
  5. Submittal & plan-review comments — PDF and DWG files ready to upload; we revise for city comments at no extra charge until approval.
Drawing Title

Process & Turnaround

Standard
5–14 business days by scope
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
AUS-006
Sheet
07 of 10
Home/Texas/Austin/FAQ

Austin, TX MEP permit drawing FAQ

Is Austin's energy code different from the rest of Texas?
Yes. Austin adopts local energy amendments that are stricter than the state minimum, so energy documentation must follow Austin's version.
Do you prepare drawings for ADUs in Austin?
Yes, including electrical service and HVAC sizing for the new unit.
How fast can I get Austin MEP drawings?
Usually 5–7 business days for residential and 7–14 for light commercial.
Drawing Title

FAQ

Questions
3
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
AUS-007
Sheet
08 of 10
Drawing Title

Contact

Status
Issued For Construction
Note
Mark void all quotes not confirmed in writing.
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
AUS-009
Sheet
10 of 10