Book A Free Zoom Call

MEP permit drawings in Miami, FL.

Permit-ready electrical, plumbing, HVAC and fire-protection drawings for Miami and Miami-Dade County, with High-Velocity Hurricane Zone and flood-zone details built in. 100% remote: plans by upload, questions by Zoom or WhatsApp.

Drawing Title

Cover Sheet

Project
MEP Permit Drawing Services
Project Address
Miami, Florida
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
MIA-000
Sheet
01 of 10
Home/Florida/Miami/Codes in Force

Which codes apply to MEP drawings in Miami?

Miami follows the statewide Florida Building Code, including its High-Velocity Hurricane Zone (HVHZ) provisions.

Miami-Dade and Broward are the two counties inside Florida's High-Velocity Hurricane Zone, so MEP drawings here need stricter wind anchorage and product-approval details than elsewhere in the state. The Florida Building Code, 8th Edition, is in force, with the 9th Edition scheduled to replace it.

  • Florida Building Code — Building, Residential, Mechanical, Plumbing, Fuel Gas and Energy Conservation volumes
  • HVHZ provisions — wind anchorage and product approvals for exterior equipment
  • Electrical — NEC as adopted by the FBC
  • Fire — Florida Fire Prevention Code
Drawing Title

Codes in Force

Adoption
Florida Building Code (HVHZ)
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
MIA-001
Sheet
02 of 10
Home/Florida/Miami/Permit Office

Permit offices in and around Miami

  • City of Miami — City of Miami Building Department
  • Miami-Dade County (unincorporated) — Department of Regulatory and Economic Resources (RER)
  • Miami Beach & Coral Gables — each city's building department
  • Hialeah, Doral & Homestead — each city's permit office
  • Fort Lauderdale & Broward cities — Broward County building departments
Drawing Title

Permit Office

Coverage
Miami & surrounding area
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
MIA-002
Sheet
03 of 10
Home/Florida/Miami/Local Requirements

What Miami plan reviewers look for

What Miami-Dade reviewers focus on.

  • HVHZ anchorage — tie-down details and product approvals for condensers, rooftop units and generators.
  • Flood zones — panels and equipment elevated above the design flood elevation.
  • Humidity control — dehumidification and ventilation design for South Florida's climate.
  • Pool, spa and generator loads — NEC load calculations.
  • Energy forms — FBC Energy Conservation documentation.
Drawing Title

Local Requirements

Focus
HVHZ, flood, humidity
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
MIA-003
Sheet
04 of 10
Home/Florida/Miami/What's Included

What's in a Miami, FL MEP permit set

Every discipline your permit needs, drawn to the code your AHJ enforces.

  • Electrical — power and lighting plans, panel schedules, load calculations and single-line/riser diagrams (NEC as adopted by the FBC)
  • Plumbing — fixture layouts, water supply sizing, DWV isometrics and gas piping (FBC Plumbing)
  • HVAC / mechanical — duct layouts, equipment schedules, ventilation and Manual J/S/D load calculations (FBC Mechanical)
  • Energy compliance — FBC Energy Conservation forms and Manual J/S/D
  • Fire protection — sprinkler layouts, hydraulic calculations and fire alarm plans (NFPA 13/13R/13D, NFPA 72) where your project needs them

Trade-specific details: electrical, plumbing, HVAC and fire protection permit drawings.

Drawing Title

What's Included

Disciplines
Electrical, Plumbing, HVAC, Energy, Fire Protection
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
MIA-004
Sheet
05 of 10
Home/Florida/Miami/PE Stamping

Do Miami, FL MEP drawings need a PE stamp?

It depends on your project and your AHJ — we check before you pay.

Most commercial MEP drawings in Miami-Dade need a Florida PE seal, and HVHZ anchorage details are often engineer-sealed. Some residential work is exempt.

Engineers who seal drawings in Florida are licensed by the Florida Board of Professional Engineers (FBPE). If your project needs sealed MEP drawings, we confirm during scoping whether a Florida-licensed engineer can seal your discipline and scope, and we put that in writing in your quote. If we can't arrange the seal for your project, we tell you up front, so you can have your own engineer of record review and seal the set. You never pay for drawings you can't submit.

Drawing Title

PE Stamping

Licensing Board
FBPE
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
MIA-005
Sheet
06 of 10
Home/Florida/Miami/Process & Turnaround

How the Miami, FL permit drawing process works

100% remote. Fixed price and delivery date, confirmed in writing before we start.

  1. Send your plans — upload architectural floor plans (PDF or DWG) on our quote page, by WhatsApp or by email.
  2. Quick Zoom call (optional) — we confirm scope and the Miami submittal checklist.
  3. Fixed quote — price and delivery date in writing within one business day.
  4. Drafting with updates — residential sets usually take 5–7 business days, light commercial 7–14, with progress updates on WhatsApp or email.
  5. Submittal & plan-review comments — PDF and DWG files ready to upload; we revise for city comments at no extra charge until approval.
Drawing Title

Process & Turnaround

Standard
5–14 business days by scope
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
MIA-006
Sheet
07 of 10
Home/Florida/Miami/FAQ

Miami, FL MEP permit drawing FAQ

What does HVHZ mean for my MEP drawings?
Exterior and rooftop equipment needs wind-rated anchorage details and approved products, so the drawings include tie-down details.
Do you do pool and generator load calculations in Miami?
Yes, as standalone calculations or as part of a full set.
How fast can I get Miami MEP drawings?
Usually 5–7 business days for residential and 7–14 for light commercial; single calculations are faster.
Drawing Title

FAQ

Questions
3
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
MIA-007
Sheet
08 of 10
Drawing Title

Contact

Status
Issued For Construction
Note
Mark void all quotes not confirmed in writing.
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
MIA-009
Sheet
10 of 10