Book A Free Zoom Call

MEP permit drawings in California.

Permit-ready electrical, plumbing, mechanical and Title 24 energy documentation for Los Angeles, San Diego, San Francisco, San Jose, Sacramento and every California jurisdiction. 100% remote: plans by upload, questions by Zoom or WhatsApp.

Drawing Title

Cover Sheet

Project
MEP Permit Drawing Services
Project Address
Statewide, California
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
CA-000
Sheet
01 of 10
Home/California/Codes in Force

Which codes apply to MEP drawings in California?

California is one of the few states with a single statewide code — the California Building Standards Code, Title 24.

Every California jurisdiction enforces the California Building Standards Code (Title 24 of the California Code of Regulations), updated on a three-year cycle, and the 2025 edition took effect on January 1, 2026. Cities and counties can add stricter local amendments, and many do, especially for all-electric construction, EV charging and seismic requirements.

  • Part 2 & 2.5 — California Building Code and California Residential Code (based on the IBC and IRC)
  • Part 3 — California Electrical Code (based on the NEC)
  • Part 4 — California Mechanical Code (based on the UMC)
  • Part 5 — California Plumbing Code (based on the UPC)
  • Part 6 — California Energy Code, administered by the California Energy Commission
  • Part 11 — CALGreen, the green building standards code, including EV-ready and water-efficiency requirements

Because California's mechanical and plumbing codes come from the Uniform codes rather than the International ones, sizing tables and venting rules differ from most other states. We draw California sets to California code, not to a generic template.

Drawing Title

Codes in Force

Adoption
Statewide (Title 24), local amendments
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
CA-001
Sheet
02 of 10
Home/California/Jurisdictions

California cities and counties we prepare drawings for

Every California city and county reviews to Title 24, plus its own local amendments.

  • Los Angeles — LADBS (Los Angeles Department of Building and Safety), with Los Angeles city amendments
  • San Diego — Development Services Department; San Diego County handles unincorporated areas
  • San Francisco — Department of Building Inspection (DBI), with San Francisco's own building, electrical, mechanical and plumbing amendments
  • San Jose — Planning, Building and Code Enforcement
  • Sacramento — Community Development Department, Building Division
  • Oakland, Fresno, Long Beach, Irvine, Riverside & Bakersfield — plus every other California city and county

Some Bay Area and Southern California cities have adopted reach codes that require or strongly favor all-electric new construction. We check for local reach codes before designing gas piping or fuel-burning equipment.

Drawing Title

Jurisdictions

Coverage
All California cities & counties
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
CA-002
Sheet
03 of 10
Home/California/State Requirements

What California plan reviewers look for

California plan check is detailed. These are the items we design for from day one.

  • Title 24 energy compliance — prescriptive or performance compliance documentation, including mandatory measures for HVAC, water heating and lighting.
  • Heat pumps and all-electric design — heat-pump space and water heating is the baseline in many compliance paths, with matching electrical panel capacity.
  • Solar and battery readiness — new homes and many commercial buildings carry solar PV and battery-ready requirements that show up on the electrical sheets.
  • CALGreen EV charging — EV-capable and EV-ready circuits and spaces sized on the panel schedule and load calculation.
  • Seismic bracing — anchorage and bracing notes for water heaters, ductwork, piping and equipment.
  • Manual J/S/D — load calculations and duct design that match the energy compliance documents.
Drawing Title

State Requirements

Focus
Title 24, CALGreen, seismic
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
CA-003
Sheet
04 of 10
Home/California/What's Included

What's in a California MEP permit set

Every discipline your permit needs, drawn to the code your AHJ enforces.

  • Electrical — power and lighting plans, panel schedules, load calculations and single-line/riser diagrams (California Electrical Code)
  • Plumbing — fixture layouts, water supply sizing, DWV isometrics and gas piping (California Plumbing Code)
  • HVAC / mechanical — duct layouts, equipment schedules, ventilation and Manual J/S/D load calculations (California Mechanical Code)
  • Energy compliance — Title 24 Part 6 compliance documentation, mandatory-measure notes and CALGreen checklists
  • Fire protection — sprinkler layouts, hydraulic calculations and fire alarm plans (NFPA 13/13R/13D, NFPA 72) where your project needs them

Trade-specific details: electrical, plumbing, HVAC and fire protection permit drawings.

Drawing Title

What's Included

Disciplines
Electrical, Plumbing, HVAC, Energy, Fire Protection
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
CA-004
Sheet
05 of 10
Home/California/PE Stamping

Do California MEP drawings need a PE stamp?

It depends on your project and your AHJ — we check before you pay.

California generally requires commercial and many multifamily MEP drawings to be prepared or supervised by a California-licensed engineer. California law also exempts some light-frame residential work from the engineer requirement, so many single-family projects can be permitted without a stamp. Your permit office has the final say.

Engineers who seal drawings in California are licensed by the California Board for Professional Engineers, Land Surveyors, and Geologists (BPELSG). If your project needs sealed MEP drawings, we confirm during scoping whether a California-licensed engineer can seal your discipline and scope, and we put that in writing in your quote. If we can't arrange the seal for your project, we tell you up front, so you can have your own engineer of record review and seal the set. You never pay for drawings you can't submit.

Drawing Title

PE Stamping

Licensing Board
BPELSG
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
CA-005
Sheet
06 of 10
Home/California/Process & Turnaround

How the California permit drawing process works

Fixed price and delivery date, confirmed in writing before we start.

  1. Free consultation — tell us about the project, the address and the permit office.
  2. Send your plans — architectural floor plans in PDF or DWG (sketches work for small residential jobs).
  3. Code check & fixed quote — we confirm the code editions and submittal checklist your California AHJ uses, then send a fixed price and timeline.
  4. Drafting & your review — residential sets usually take 5–7 business days, light commercial 7–14. You mark up, we revise.
  5. Submittal & plan-review comments — you get PDF and DWG files ready to upload; if the reviewer issues comments, we revise the drawings at no extra charge until approval.

For projects that need signed Title 24 energy documents, we coordinate the compliance forms with your mechanical and electrical drawings so the numbers match. Mismatched numbers are one of the most common plan-check corrections.

Drawing Title

Process & Turnaround

Standard
5–14 business days by scope
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
CA-006
Sheet
07 of 10
Home/California/FAQ

California MEP permit drawing FAQ

What is Title 24 and does my project need it?
Title 24 is California's statewide building standards code. Part 6, the Energy Code, applies to new buildings, additions and most alterations that touch HVAC, water heating, lighting or the building envelope. If you're pulling a permit for that kind of work, you'll need Title 24 documentation.
Do California MEP drawings need a PE stamp?
Commercial and larger multifamily MEP drawings usually need a California-licensed engineer's signature. Many single-family projects are exempt. We confirm your city's rule before quoting.
Which code edition is California using now?
The 2025 California Building Standards Code has been in effect since January 1, 2026. Projects submitted for permit before that date may still be reviewed under the 2022 edition.
Is all-electric construction required in California?
Not statewide, but the Energy Code strongly favors heat pumps, and many cities have local reach codes that require or encourage all-electric new construction. We check your city before designing gas systems.
How long does it take to get California MEP permit drawings?
Usually 5–7 business days for residential and 7–14 for light commercial after we receive complete architectural plans. Title 24 documentation is prepared alongside the drawings.
Do you prepare Manual J calculations for California?
Yes. Every residential HVAC set includes Manual J load calculations, plus Manual S and D where needed, coordinated with the Title 24 compliance documents.
Drawing Title

FAQ

Questions
6
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
CA-007
Sheet
08 of 10
Drawing Title

Contact

Status
Issued For Construction
Note
Mark void all quotes not confirmed in writing.
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
CA-009
Sheet
10 of 10