Book A Free Zoom Call

MEP permit drawings in Los Angeles, CA.

Permit-ready electrical, plumbing, mechanical and Title 24 documentation for Los Angeles homes, ADUs, restaurants and commercial projects, formatted for LADBS plan check. 100% remote: plans by upload, questions by Zoom or WhatsApp.

Drawing Title

Cover Sheet

Project
MEP Permit Drawing Services
Project Address
Los Angeles, California
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
LA-000
Sheet
01 of 10
Home/California/Los Angeles/Codes in Force

Which codes apply to MEP drawings in Los Angeles?

Los Angeles enforces California's Title 24 with its own Los Angeles amendments.

The City of Los Angeles enforces the California Building Standards Code (Title 24, 2025 edition since January 1, 2026) with Los Angeles city amendments. MEP drawings go through plan check at the Los Angeles Department of Building and Safety (LADBS).

  • Building & residential — California Building and Residential Codes with LA amendments
  • Electrical — California Electrical Code with LA amendments
  • Plumbing — California Plumbing Code (UPC-based)
  • Mechanical — California Mechanical Code (UMC-based)
  • Energy — California Energy Code (Title 24 Part 6) and CALGreen
Drawing Title

Codes in Force

Adoption
Title 24 + Los Angeles amendments
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
LA-001
Sheet
02 of 10
Home/California/Los Angeles/Permit Office

Permit offices in and around Los Angeles

  • City of Los Angeles — LADBS plan check
  • LA County (unincorporated) — LA County Public Works, Building and Safety
  • Long Beach, Pasadena & Glendale — each city's own building department
  • Santa Monica, Burbank & Beverly Hills — each city's plan check, often with local reach codes
  • Torrance, Inglewood & Santa Clarita — plus every LA-area jurisdiction

Los Angeles County has dozens of cities, each with its own building department and amendments. We confirm the exact jurisdiction from your address.

Drawing Title

Permit Office

Coverage
Los Angeles & surrounding area
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
LA-002
Sheet
03 of 10
Home/California/Los Angeles/Local Requirements

What Los Angeles plan reviewers look for

Common LADBS plan-check corrections, and how we avoid them.

  • Title 24 energy compliance — compliance forms that match the mechanical, plumbing and lighting sheets.
  • ADUs — electrical service, panel capacity and HVAC sizing for accessory dwelling units.
  • Seismic bracing — water heater strapping and equipment anchorage notes.
  • CALGreen — EV-ready circuits and water-efficiency requirements.
  • Restaurants — hoods, grease interceptors and gas piping coordinated for plan check.
Drawing Title

Local Requirements

Focus
Title 24, ADUs, seismic
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
LA-003
Sheet
04 of 10
Home/California/Los Angeles/What's Included

What's in a Los Angeles, CA MEP permit set

Every discipline your permit needs, drawn to the code your AHJ enforces.

  • Electrical — power and lighting plans, panel schedules, load calculations and single-line/riser diagrams (California Electrical Code)
  • Plumbing — fixture layouts, water supply sizing, DWV isometrics and gas piping (California Plumbing Code)
  • HVAC / mechanical — duct layouts, equipment schedules, ventilation and Manual J/S/D load calculations (California Mechanical Code)
  • Energy compliance — Title 24 Part 6 compliance documentation, CALGreen checklists and Manual J/S/D
  • Fire protection — sprinkler layouts, hydraulic calculations and fire alarm plans (NFPA 13/13R/13D, NFPA 72) where your project needs them

Trade-specific details: electrical, plumbing, HVAC and fire protection permit drawings.

Drawing Title

What's Included

Disciplines
Electrical, Plumbing, HVAC, Energy, Fire Protection
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
LA-004
Sheet
05 of 10
Home/California/Los Angeles/PE Stamping

Do Los Angeles, CA MEP drawings need a PE stamp?

It depends on your project and your AHJ — we check before you pay.

Commercial and many multifamily MEP drawings in Los Angeles need a California-licensed engineer's signature. Many single-family homes and ADUs can be permitted without one.

Engineers who seal drawings in California are licensed by the California Board for Professional Engineers, Land Surveyors, and Geologists (BPELSG). If your project needs sealed MEP drawings, we confirm during scoping whether a California-licensed engineer can seal your discipline and scope, and we put that in writing in your quote. If we can't arrange the seal for your project, we tell you up front, so you can have your own engineer of record review and seal the set. You never pay for drawings you can't submit.

Drawing Title

PE Stamping

Licensing Board
BPELSG
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
LA-005
Sheet
06 of 10
Home/California/Los Angeles/Process & Turnaround

How the Los Angeles, CA permit drawing process works

100% remote. Fixed price and delivery date, confirmed in writing before we start.

  1. Send your plans — upload architectural floor plans (PDF or DWG) on our quote page, by WhatsApp or by email.
  2. Quick Zoom call (optional) — we confirm scope and the Los Angeles submittal checklist.
  3. Fixed quote — price and delivery date in writing within one business day.
  4. Drafting with updates — residential sets usually take 5–7 business days, light commercial 7–14, with progress updates on WhatsApp or email.
  5. Submittal & plan-review comments — PDF and DWG files ready to upload; we revise for city comments at no extra charge until approval.
Drawing Title

Process & Turnaround

Standard
5–14 business days by scope
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
LA-006
Sheet
07 of 10
Home/California/Los Angeles/FAQ

Los Angeles, CA MEP permit drawing FAQ

Do you prepare Title 24 documentation for Los Angeles?
Yes. Title 24 energy compliance is prepared with the MEP drawings so the numbers match, which avoids a common plan-check correction.
Do you do MEP drawings for ADUs in LA?
Yes, including panel and service upgrades, HVAC sizing and Title 24.
Do LA MEP drawings need a stamp?
Commercial projects usually do. Many single-family projects and ADUs don't. We confirm before quoting.
How fast can I get LA MEP drawings?
Usually 5–7 business days for residential and 7–14 for light commercial.
Drawing Title

FAQ

Questions
4
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
LA-007
Sheet
08 of 10
Drawing Title

Contact

Status
Issued For Construction
Note
Mark void all quotes not confirmed in writing.
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
LA-009
Sheet
10 of 10