Book A Free Zoom Call

MEP permit drawings in Texas.

Permit-ready electrical, plumbing, HVAC and fire-protection drawings for Houston, Dallas, Austin, San Antonio, Fort Worth and every Texas city — drawn to the code edition and local amendments your permit office enforces. 100% remote: plans by upload, questions by Zoom or WhatsApp.

Drawing Title

Cover Sheet

Project
MEP Permit Drawing Services
Project Address
Statewide, Texas
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
TX-000
Sheet
01 of 10
Home/Texas/Codes in Force

Which codes apply to MEP drawings in Texas?

Texas has no single statewide building code — each city adopts its own editions and amendments.

Texas law sets a floor rather than one statewide code: municipalities enforce the International Residential Code and International Building Code, the National Electrical Code is applied statewide through the Texas Department of Licensing and Regulation, and the State Energy Conservation Office sets minimum energy-code requirements. On top of that, each city chooses its own editions and writes local amendments. That is why a set approved in Dallas can come back with comments in Houston.

  • Building — International Building Code (IBC) for commercial and International Residential Code (IRC) for one- and two-family homes, adopted city by city
  • Electrical — National Electrical Code (NEC), adopted statewide with local amendments in some cities
  • Plumbing — International Plumbing Code (IPC) or Uniform Plumbing Code (UPC), depending on the city
  • Mechanical & fuel gas — International Mechanical Code (IMC) and International Fuel Gas Code (IFGC) in most jurisdictions
  • Energy — International Energy Conservation Code (IECC) / IRC Chapter 11, with many large cities on newer editions than the state minimum

Before we draw a single line we pull your city's current adoption ordinance, so load calculations, panel schedules and fixture-unit sizing match the edition the plan reviewer will check against.

Drawing Title

Codes in Force

Adoption
City by city, with state minimums
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
TX-001
Sheet
02 of 10
Home/Texas/Jurisdictions

Texas cities and counties we prepare drawings for

We research your permit office's submittal checklist before drafting.

  • Houston — Houston Permitting Center; the Houston Construction Code is based on the International Codes with city amendments
  • Dallas — City of Dallas Development Services, including residential and commercial plan review
  • Austin — Development Services Department; Austin applies local energy amendments that affect HVAC and envelope
  • San Antonio — Development Services Department (One Stop Center)
  • Fort Worth — Development Services, Building Plan Review
  • El Paso, Arlington, Plano, Frisco, Corpus Christi & Lubbock — plus suburban cities and county-permitted areas statewide

Building in an unincorporated county area? Texas counties have limited authority to require building permits, so requirements there are often lighter. We confirm exactly what your AHJ asks for during scoping, so you don't pay for sheets nobody will review.

Drawing Title

Jurisdictions

Coverage
All Texas cities & counties
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
TX-002
Sheet
03 of 10
Home/Texas/State Requirements

What Texas plan reviewers look for

Common reasons Texas plan reviewers send MEP sets back — and how we prevent them.

  • HVAC sizing in a hot climate — Texas spans IECC climate zones 2 and 3 (and zone 4 in the Panhandle). Reviewers increasingly ask for Manual J, S and D calculations instead of rule-of-thumb tonnage.
  • Electrical load calculations — service sizing per NEC Article 220, with EV charging and heat-pump loads shown on the panel schedule.
  • Energy code compliance — duct leakage, equipment efficiency and lighting power density documented on the drawings, matching your city's IECC edition.
  • Flood-zone equipment elevation — in Houston and coastal counties, HVAC and electrical equipment must sit above the design flood elevation, and we show it on plan.
  • Gas piping — pipe sizing and isometrics for gas ranges, water heaters and furnaces, a frequent comment on Texas residential remodels.
Drawing Title

State Requirements

Focus
Loads, energy, flood zones
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
TX-003
Sheet
04 of 10
Home/Texas/What's Included

What's in a Texas MEP permit set

Every discipline your permit needs, drawn to the code your AHJ enforces.

  • Electrical — power and lighting plans, panel schedules, load calculations and single-line/riser diagrams (NEC as adopted in Texas)
  • Plumbing — fixture layouts, water supply sizing, DWV isometrics and gas piping (IPC or UPC, per your city)
  • HVAC / mechanical — duct layouts, equipment schedules, ventilation and Manual J/S/D load calculations (IMC / IRC mechanical)
  • Energy compliance — IECC / IRC Chapter 11 compliance notes, Manual J load calcs and equipment efficiency schedules
  • Fire protection — sprinkler layouts, hydraulic calculations and fire alarm plans (NFPA 13/13R/13D, NFPA 72) where your project needs them

Trade-specific details: electrical, plumbing, HVAC and fire protection permit drawings.

Drawing Title

What's Included

Disciplines
Electrical, Plumbing, HVAC, Energy, Fire Protection
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
TX-004
Sheet
05 of 10
Home/Texas/PE Stamping

Do Texas MEP drawings need a PE stamp?

It depends on your project and your AHJ — we check before you pay.

Texas engineering law requires engineering work for the public to be done by a licensed Professional Engineer, and most Texas cities require sealed MEP drawings for commercial projects. Many single-family remodels and additions can be permitted without an engineer's seal, so the requirement depends on your building type, size and city.

Engineers who seal drawings in Texas are licensed by the Texas Board of Professional Engineers and Land Surveyors (TBPELS). If your project needs sealed MEP drawings, we confirm during scoping whether a Texas-licensed engineer can seal your discipline and scope, and we put that in writing in your quote. If we can't arrange the seal for your project, we tell you up front, so you can have your own engineer of record review and seal the set. You never pay for drawings you can't submit.

Drawing Title

PE Stamping

Licensing Board
TBPELS
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
TX-005
Sheet
06 of 10
Home/Texas/Process & Turnaround

How the Texas permit drawing process works

Fixed price and delivery date, confirmed in writing before we start.

  1. Free consultation — tell us about the project, the address and the permit office.
  2. Send your plans — architectural floor plans in PDF or DWG (sketches work for small residential jobs).
  3. Code check & fixed quote — we confirm the code editions and submittal checklist your Texas AHJ uses, then send a fixed price and timeline.
  4. Drafting & your review — residential sets usually take 5–7 business days, light commercial 7–14. You mark up, we revise.
  5. Submittal & plan-review comments — you get PDF and DWG files ready to upload; if the reviewer issues comments, we revise the drawings at no extra charge until approval.

Working to a tight Houston or Dallas permit date? Ask about rush delivery during your free consultation.

Drawing Title

Process & Turnaround

Standard
5–14 business days by scope
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
TX-006
Sheet
07 of 10
Home/Texas/FAQ

Texas MEP permit drawing FAQ

Do MEP drawings in Texas need a PE stamp?
Commercial MEP drawings in most Texas cities must be sealed by a Texas-licensed PE. Many residential remodels don't need a seal. Houston, Dallas, Austin and San Antonio each set their own thresholds, so we check your city's rule before quoting.
Which building code does Texas use?
There is no single statewide code. Cities enforce editions of the IBC, IRC, NEC, IPC or UPC, IMC and IECC, each with local amendments. We draw to the edition your city enforces.
How much do MEP permit drawings cost in Texas?
It depends on square footage, building type and how many disciplines you need. A single-trade residential set costs far less than a full commercial MEP package. Send us your plans for a fixed quote, usually within one business day.
How long does it take to get MEP drawings for a Texas permit?
Typically 5–7 business days for residential and 7–14 for light commercial, starting from complete architectural plans. Rush delivery is available.
Do I need a Manual J for an HVAC permit in Texas?
Many Texas jurisdictions require Manual J load calculations for new systems and replacements that change capacity, and reviewers in Austin and Houston routinely ask for them. We include Manual J/S/D in every residential HVAC set.
Can you prepare drawings for an unincorporated Texas county?
Yes. Counties usually require less than cities, and some require no building permit at all. We confirm what your county or utility needs so you only pay for the sheets you need.
Drawing Title

FAQ

Questions
6
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
TX-007
Sheet
08 of 10
Drawing Title

Contact

Status
Issued For Construction
Note
Mark void all quotes not confirmed in writing.
Scale
As Shown
Date
Est. 2016
Drawn By
MEPPERMIT
Checked By
City Reviewer
TX-009
Sheet
10 of 10