Complete electrical plan sets for building permit approval — drawn to the National Electrical Code and your local amendments, delivered as PDF + DWG with free revisions until your permit is approved.
Cover Sheet
Every sheet your AHJ expects in an electrical submittal.
Interior and exterior lighting layouts, switching and controls, with photometric calculations where the AHJ requires them.
Receptacle and equipment power layouts, dedicated circuits, disconnects and equipment connections.
Service load calculations per NEC Article 220, feeder and service sizing, breaker schedules.
Service entrance, power distribution, and grounding electrode system shown clearly for plan review.
Initiating and notification device layouts with riser diagrams per NFPA 72.
Lighting compliance documentation (COMcheck/REScheck or Title 24) matched to your jurisdiction.
Cover Sheet
We design to the NEC edition your AHJ enforces (2023 or 2020), including AFCI/GFCI protection rules, receptacle spacing, and service disconnect requirements — then check your city's local amendments before we draw, so review comments stay minimal.
What's Included
Where your jurisdiction requires an engineer's seal, we coordinate stamping by a Professional Engineer licensed in your project state. Licensure is confirmed per project before we accept the job — never assumed.
PE Stamping
Typical residential electrical sets in 5–7 business days; commercial and multi-family sets in 2–3 weeks. Rush delivery is available when your permit clock is ticking.
Turnaround
FAQ
Let's get started. Share your plans and jurisdiction details, and we'll deliver a precise, permit-ready MEP package engineered for approval.
Contact