Moving a toilet 3 feet sounds like a weekend job. Under the floor it changes the drain, the vent and the math behind the whole plumbing system, and that is exactly what the permit is for.
Permit to Move a Toilet
Moving or adding a toilet changes the plumbing system, not just the fixture.
Moving a toilet, or adding one, needs a plumbing permit in most US jurisdictions, because you are changing the drain, waste and vent (DWV) system, not only the fixture you can see. A like-for-like replacement in the exact same spot often does not need a permit, but rules vary by city, so check with your local building department before work starts.
Every toilet connects to a hidden system with three jobs, and the letters DWV name them:
Move the toilet and all three change at once: the drain run gets longer or shorter, its slope changes, the vent connection moves, and the load on the stack changes. The part that matters is the part you cannot see once the floor closes up.
Short Answer
Gravity carries water and solids together only at the right speed.
A drain works because gravity carries water and solids together at the right speed, and that speed comes from slope. For a residential toilet drain (usually 3-inch pipe), most installers use 1/4 inch of fall per foot of run. The International Plumbing Code (IPC) allows a minimum of 1/8 inch per foot for 3-inch and larger drains, while the Uniform Plumbing Code (UPC) generally calls for 1/4 inch. Your city's adopted code has the final word.
Moving a toilet 3 feet changes the length of the run, which changes the total fall the pipe needs and whether the floor framing has room for it. Inspectors check slope at the rough-in inspection, before floors and walls close.
Drain Slope
The water seal in the trap only survives if air can follow the draining water.
Every fixture trap holds a small plug of water that seals the room off from the sewer. That seal survives only if air can enter the system behind the draining water. Without a working vent, draining water can siphon the trap dry, and sewer gas comes back into the room.
When the toilet moves, its vent connection moves too. The vent must tie in at the right place and rise correctly, and the distance from the trap to the vent is limited by code. A vent that is too far away, tied in at the wrong height or missing is one of the most common reasons a plumbing rough-in fails inspection.
Venting
Pipe sizes come from code tables, not guesses.
Every fixture is assigned a load value called drainage fixture units (DFU), and the total load sets the size of the pipe that carries it. A residential toilet (water closet) is typically 3 DFU in the IPC tables.
If you are adding a bathroom, the stack and the building drain carry more fixture units, and existing pipe sizes may no longer be enough. If you are moving a toilet onto a different branch or stack, the load on each pipe changes and the sizes must be re-checked. The riser diagram is where reviewers see all of this at a glance.
Fixture Units
Four steps, and the second inspection is the one that catches expensive mistakes.
Reviewers check the same things on nearly every set: pipe sizes on the plan, slopes noted, a vent for every fixture, and sizes that tie back to the fixture-unit totals. Sets that show all of it move faster. City rules differ, for example in Los Angeles, New York City and Houston.
Permit Process
Unpermitted plumbing work rarely causes trouble on installation day. It tends to surface at a home sale, a refinance appraisal or an insurance claim, and by then the fix can mean opening finished floors and walls, paying fines or higher fees, and getting the permit anyway.
Replacing a toilet in the exact same location, with no change to the drain, vent or water lines, usually does not need a permit in many jurisdictions: it is a fixture replacement, not a system change. The moment a drain moves, a vent moves or a fixture is added, most cities treat it as permit work.
Exceptions
General educational information only. Plumbing codes vary by jurisdiction, including which edition of the IPC or UPC your city has adopted and its local amendments. Always confirm requirements with your local building department. The sketches are original sample illustrations, not stamped, approved or project drawings.